• Package Qty Priced per Package
    1-4 US $2.22
    5+ US $1.49
  • 8 Days
    Shipping Weight: 168(g)
  • Shipping Time:
  • Coupons US$140 for NEW Client. Register Now >>

    Ask a Question

    480Pcs 4 Style Dyed Natural Wood Beads, Oval/Oblong, Lead Free, Green, 6~23x4~9mm, Hole: 2~3mm, 120pcs/style(WOOD-PH0002-47)

    *Category:

    Please select a category.

    Comments:

    Please input your request.

    I Want Smaller Lots

    480Pcs 4 Style Dyed Natural Wood Beads, Oval/Oblong, Lead Free, Green, 6~23x4~9mm, Hole: 2~3mm, 120pcs/style(WOOD-PH0002-47)

    Original Packing

    • QTY : Package
    • Package Size : Box/package
    Box

    Invalid Input

    I Want Mixed Products

    480Pcs 4 Style Dyed Natural Wood Beads, Oval/Oblong, Lead Free, Green, 6~23x4~9mm, Hole: 2~3mm, 120pcs/style(WOOD-PH0002-47)

    Comments: Please input your mixed request.

    • Item Code: Please input the item code.

      Comments: Please input your mixed request.

    + Add Mixed Products

Product Description

480Pcs 4 Style Dyed Natural Wood Beads, Oval/Oblong, Lead Free, Green

Size:

Round: about 6x4~5mm, Hole: 2mm, about 120pcs;

Round: about 8x7mm, Hole: 3mm, about 120pcs;

Round: about 10x9mm, Hole: 3mm, about 120pcs;

Oval/Oblong: about 23x8~9mm, Hole: 2.5mm, about 120pcs;

Box: 22x16x1.5cm, 1pc.

Priced per 1 Box

Please Note:

Due to stock variety, color or shape of mixed products may vary from photo sample shown on our website. The color may be slightly different from the picture because of different display device.

Specification Size Info

Size 6~23x4~9mm, Hole: 2~3mm, 120pcs/style
Material Wood
Color Green
Shape Oval
Usage Beads
Package Size 1 Box per package

Customer Reviews

Share your thoughts with other customers and get xyzbeads points.

Customer Questions

Confirm

Please Note

OK

Please Note

OK

Search by Image

·Search kbeads with an image instead of text. Try dragging an image here.

  • 1. The image must be in one of the following formats: .jpg, .png, .jpeg, .bmp, .gif, .webp, .tiff, .ppm
    2. The size of the image should be less than 5M!
    3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 1024pixes.
  • 1. The image must be in one of the following formats: .jpg, .png, .jpeg, .bmp, .gif, .webp, .tiff, .ppm
    2. The size of the image should be less than 5M!
    3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 1024pixes.

Uploading File