• Price/Package: US $9.37 YOUR PRICES
  • Bronze Price:

    US $9.09

    3%off
  • Silver Price:

    US $8.81

    6%off
  • Gold Price:

    US $8.53

    9%off
  • Diamond Price:

    US $8.24

    12%off
  • Crown Price:

    US $7.96

    15%off
  • 8 Days
    Shipping Weight: 1,000(g)
  • Shipping Time:
  • Coupons US$140 for NEW Client. Register Now >>

    Ask a Question

    Dyed Wood Beads, Oval/Oblong, Lead Free, Coconut Brown, 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g(WOOD-Q003-23x8mm-01-LF)

    *Category:

    Please select a category.

    Comments:

    Please input your request.

    I Want Smaller Lots

    Dyed Wood Beads, Oval/Oblong, Lead Free, Coconut Brown, 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g(WOOD-Q003-23x8mm-01-LF)

    Original Packing

    • QTY : Package
    • Package Size : g/package
    g

    Invalid Input

    I Want Mixed Products

    Dyed Wood Beads, Oval/Oblong, Lead Free, Coconut Brown, 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g(WOOD-Q003-23x8mm-01-LF)

    Comments: Please input your mixed request.

    • Item Code: Please input the item code.

      Comments: Please input your mixed request.

    + Add Mixed Products

Product Description

Dyed Wood Beads, Oval/Oblong, Lead Free, Coconut Brown

Size: about 23mm long, 8~9mm wide, Hole: 2.5mm; about 2000pcs/1000g.

Priced per 1,000 g

Please Note:

Due to stock variety, color or shape of mixed products may vary from photo sample shown on our website. The color may be slightly different from the picture because of different display device.

Specification Size Info

Size 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g
Material Maple Wood
Color Coconut Brown
Shape Oval
Usage Beads
Package Size 1,000 g per package

Customer Reviews

Share your thoughts with other customers and get xyzbeads points.

Customer Questions

Confirm

Please Note

OK

Please Note

OK

Search by Image

·Search kbeads with an image instead of text. Try dragging an image here.

  • 1. The image must be in one of the following formats: .jpg, .png, .jpeg, .bmp, .gif, .webp, .tiff, .ppm
    2. The size of the image should be less than 5M!
    3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 1024pixes.
  • 1. The image must be in one of the following formats: .jpg, .png, .jpeg, .bmp, .gif, .webp, .tiff, .ppm
    2. The size of the image should be less than 5M!
    3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 1024pixes.

Uploading File

NO FREE SHIPPING

This item is not eligible for free shipping, you will need to pay the original price for shipping.